CIP Project |
Project Description |
Measure P Contribution |
16-48 |
East Whisman Area Transit-Oriented Development Improvements:
- Pavement resurfacing
- High visibility crosswalk and shortened crosswalks
- Multi-use path on the west side of Ellis Street between Fairchild Drive and Manila Avenue
|
$1,240,000 |
20-47 |
Calderon Avenue Bike Lane-Mercy TO ECR:
- Pavement resurfacing
- High visibility crosswalks
- Class II bike lanes
|
$140,000 |
20-58 |
Castro Pedestrian Mall Feasibility Study:
- Evaluate feasibility of a pedestrian mall as part of the Transit Center Improvements
|
$265,000 |
20-59 |
Automated Guideway Transportation, Phase II, Feasibility Study:
- Evaluate alternative route alignments for an autonomous transit system
|
$500,000 |
21-34 |
North Bayshore Transportation Improvements :Coordination, and Implementation:
- Contract assistance to coordinate a variety of transportation projects and analyses, including North Bayshore Circulation Study, the Gateway Master Plan, and individual projects and initiatives.
|
$30,355 |
21-37 |
Active Transportation Improvements:
- Reconstruct bicycle and pedestrian pathway on east side of Shoreline Blvd.
- ADA-compliant curb ramps
- Pathway lighting
|
$2,200,000 |
21-39 |
Grant Road and Sleeper Avenue Intersection Improvements:
- Installation of a Pedestrian Hybrid Beacon (PHB)
- High-visibility crosswalks across the southern, northern, and eastern legs of Grant Road with left turn restriction from Sleeper Avenue
- Bike lane improvements crossing Grant Road
- ADA compliant curb ramps
9 Other Intersections:
- High-visibility crosswalks
- LED-enhanced signs
|
$675,000 |
21-59 |
Narrow Streets Sign Installation:
- Installation of street signs where oversized vehicle parking on narrow streets is prohibited pursuant to MC City code section 19.79.4.
|
$485,000 |
22-01 |
Annual Street Maintenance (Middlefield Road Complete Streets):
- Class IV bikeways between Moffett and Bernardo
- Pavement resurfacing
- High visibility crosswalks
- Protected intersection improvements
- Installation of a PHB at Tyrella Avenue
|
$144,000 |
22-29 |
El Camino Real Pavement Resurfacing Bike and Pedestrian Improvements:
- Pavement resurfacing
- Bike lanes
- New mid-block pedestrian crossings at Bonita Avenue, Pettis Avenue, and Crestview Drive
- Replace curb ramps
|
$1,800,000 |
22-30 |
Terra Bella Avenue Bikeway Feasibility Study:
- Assess feasibility of on-street bikeway
|
$210,000 |
23-30 |
Active Transportation Improvements:
- New and enhanced crosswalk striping and signage.
- ADA compliant curb ramps.
|
$600,000 |
23-31 |
Street Reconstruction Project (Miramonte Ave - Castro to ECR).
- Pavement reconstruction
- Bike lanes
- High visibility crosswalks
|
$100,000 |
23-49 |
Interim Castro Pedestrian Mall Improvement:
- Pavement resurfacing
- High visibility crosswalks
|
$1,000,000 |
Total Measure P Contribution - $9,389,355